China Resources Snow Brewery Shenyang Plant CO2 Supply Project
The project is configured with three 100 cubic meter liquid carbon dioxide storage tanks, providing food-grade carbon dioxide for beer production. The system flow is: storage tank → water-bath electric heating vaporizer → pressure reducing system, meeting the needs of beer filling and gas aeration.
← Back to case list